Starting in the summer of 2017, the roof at Pinelands Regional High School was replaced. The building, which opened in 1979, was topped with decaying asbestos containing material (ACM) in addition to other debris that had accumulated over

Activist #MMT – the podcast
Starting in the summer of 2017, the roof at Pinelands Regional High School was replaced. The building, which opened in 1979, was topped with decaying asbestos containing material (ACM) in addition to other debris that had accumulated over
The reason to avoid working on an occupied building, especially one containing a sensitive population such as a school, is to avoid the clear health hazards that occur within the first few
Written by Jeff Epstein, editor of Citizens’ Media TV This article is a repository of all daily reports for the 2017 Pinelands Regional High School
This article is a repository of all contracts, and daily and special reports for the 2017 Pinelands Regional High School roofing project. It will be updated whenever new information is made available.
This article contains everything currently known about Epic Environmental’s critical September tenth letter:
When it was discovered by all parties,
The original email that delivered